Solution for contamination control on 3 pre-treatment stages (30m3 – 30m3 – 140m3). Integration and installation by Geico Taikisha Germany with Engineering Support of Esselent Solutions.

Our contribution to this project concerns the delivery of:

  • 2x Suparator® type 88/3000 + platform
  • 1x Suparator® type 88/4500 + platform
  • 3x Q-Mag® type QM10, integrated on Suparator® 88’s
  • 3x Q-Filter® type QF150 + platform
  • Project engineering
  • Technical Advice and Engineering Support on the right integration
  • Filter cloth selection and supply
  • Commissioning and training on site